Description and Specification for Lab Tenders
Astra Scientific Refrigeration Assembly and Maintenance Accessories.
The unit trainees can learn working within a complex project. This
involves the planning, implementation and checking of processes related
to assembly, commissioning and maintenance. The assembly relates to
refrigeration installation: installation of the LP and HP pressure
switches, the expansion valve and the pipework of the refrigeration
circuit. The pipe joints are not soldered but bolted. The electro
technical installation includes the wiring and connection of all units
and switching elements.
The experiment is arranged on a workbench with drawers for storing the
components and tools. Assembly panel and refrigeration chamber are
mounted on a frame. Frame, condensing unit and switch cabinet are bolted
permanently to the working surface. The refrigeration and electrical
components are attached to the aluminum assembly panel.
FEATURES:
• Planning and executing assembly steps and processes
• Making pipe joints in accordance with a system diagram
• Carrying out electrical installation in accordance with a circuit diagram
• Filling and evacuating of the refrigeration system
• Commissioning and checking the refrigeration system after successful assembly
• Assembly of a refrigeration system from individual components
SPECIFICATION:
• Condensing unit
Power consumption: 190W
Refrigeration capacity: 373W at 5°C evaporation temperature
• Receiver: approx. 1L
• Show case evaporator
Capacity: 50W at t0=-6°C, ΔT=8K
Transfer area: 1,06m2
• Refrigeration chamber with sight window
LxWxH: 480x280x390mm
Aluminum assembly panel
LxW: 710x500mm
Thermostatic expansion valve, adjustable
Thermostat, adjustable: -30…15°C
• Required for operation
230V, 50Hz, 1 phase
230V, 60Hz, 1 phase