Description and Specification for Lab Tenders
Refrigerator Model Training System, We are manufacturer, supplier, exporter and solution provider in quality Refrigerator Model Training System.
Refrigerator Model Training System completely places all essential
refrigerator components on the front panel of the system. Only when
students understand the operation principal of the refrigerator can they
connect the components
correctly. Under such circumstance, KR-101 becomes a real refrigerator
and students can use the meters located on the front panel to record the
status of the components during its operation.
KR-101 also clearly demonstrates four major elements, Condenser,
Compressor, Evaporator, and Capillary Tube located at the rear side of
the system. Students can touch and feel the elements as well as draw
the Mollier diagram to record the characteristic of the refrigerant
during different phase of the
refrigeration cycle.
For the sake of quick demonstration, KR-101 provides a Teacher
Board for teacher to insert it into the side slot. When teacher board is
inserted, the whole system starts running even when the wire
connections on the front panel are incorrect.1. Practical exercise for
RSC wires of the compressor
2. Constructing the control circuit of the refrigerator system
3. Management of the refrigerator system
4. Characteristics of the refrigerator
5. Drawing Mollier Chart
6. Calculating the performance of the refrigerator- The major elements
of the refrigeration system including condenser, compressor, evaporator,
capillary
tube, filter and drier are open for the purpose of best observation.
- The system contains various electronic components and their symbols
located at the front panel
allowing students to use 4mm safety plug cables to construct the
control circuit of the refrigeration
system.
- The control circuit of the refrigeration system are made of following
electronic devices: system fuse, fan
indicator, evaporator door switch...etc.
- The system includes high pressure gauge, low pressure gauge, AC
Voltmeter, AC Ammeter and
temperature meter which are located at the front panel allowing
students to record the status of the
components during its operation.
- The refrigerant path for high pressure tube is painted in red and for
low pressure tube is painted in
blue.
- The system includes a teacher board allowing teacher to quick
demonstrate the operation of the
refrigeration system without construct the control circuits.